Biddeston Engineering asked ColorBlast to complete an epoxy floor for them. The floor had to be laid around existing machinery, as the equipment could not be moved. They needed a hard wearing easy to clean surface. They required a fast turnaround of 1 day for minimum machinery downtime.
Services Used
Epoxy Flooring
Location
Biddeston, Queensland
Turnaround Time
1 Day